Toshiba 960-809 manual Running Test(Task #6), Sub test No

Models: 960-809

1 484
Download 484 pages 342 b
Page 280
Image 280

Tests and Diagnostics

3.35.5.2Running TestTask #6

This test is a continuous test to be applied to the devices capable of unattended operation. The name of test device and the number of subtest being tested are displayed on the screen during a test.

The following table indicates the test items.

Test Name

Sub test No.

 

 

Memory

01Conventional Memory

02Protected Mode

‐ ‐

04Stress Test

Display

01VRAM read / write for VGA

 

Real Timer

02Backup memory

HDD

01Sequential read

 

 

3-168

[CONFIDENTIAL]

PORTEGE M780 Maintenance Manual (960-809)

Page 280
Image 280
Toshiba 960-809 manual Running Test(Task #6), Sub test No