Toshiba 960-809 manual 110

Models: 960-809

1 484
Download 484 pages 342 b
Page 222
Image 222

Tests and Diagnostics

3.34.4.3Test Procedure

This section describes operation procedure of WinPE T&D.

1)Select the test item to run from Test Item and check it. (If you put a check mark in the ALL Item Check check box, all test items are checked.)

2)Select the test mode of each test.

(If you put a check mark in the ALL Detail Check check box, all tests are performed in the Detail mode.)

3)Set the number of LOOP CONT, Multitask and CPU Stress.

4)Click on the [START] button and the test starts.

5)When "Multitask" is checked and a test is started, the test of Keyboard and Mouse is done once first. Next, other tests are started.

6)If PASS of each test reaches the value set to [LOOP COUNT] the number of pass times, the test is terminated, or if the [STOP] button is clicked, the test is terminated

Note: The test item grayed out indicates that the test is not ready yet and you cannot select it.

3-110

[CONFIDENTIAL]

PORTEGE M780 Maintenance Manual (960-809)

Page 222
Image 222
Toshiba 960-809 manual 110