Toshiba 960-809 manual Installing the system board

Models: 960-809

1 484
Download 484 pages 342 b
Page 369
Image 369

4 Replacement Procedures

4.21 System board

Installing the system board

The following describes the procedure for installing the system board. (See Figure 4-36 and 4-37.)

1.Set the system board to the cover assembly.

2.Lift up the system board and connect the sensor cable to the connector CN9530 on the system board.

3.Turn up the black sheet and arrange the Bluetooth cable in place.

4.Stick the acetate tape in place.

CAUTION: Be careful not to pinch the Bluetooth cable between the system board and cover assembly.

5.Set the core of the MDC cable to the slot.

6.Set the modem jack to the slot and stick the acetate tape in place.

7.Secure the system board with the following screws.

∙ M2.5×4.0B

FLAT HEAD screw

×2

CAUTION: Make sure the system board is not lifted up by the cables.

4-60

[CONFIDENTIAL]

PORTÉGÉ M780 Maintenance Manual (960-809)

Page 369
Image 369
Toshiba 960-809 manual Installing the system board