
❑Do not remove the board from its
❑Handle the board by the faceplate only.
Use proper grounding techniques when you install the Bridge Module. These techniques include using a foot strap and grounded mat or wearing a grounded
Unpacking Procedures
Use the following procedure when unpacking your Bridge Module.
1.Verify that the Bridge Module is the correct model by matching the model number listed on the side of the shipping carton to the model number you ordered
Note that the product model number printed on the shipping box differs from the model number on the product. The model number on the shipping box contains the prefix ‘3C9’.
2.Remove the module in its
3.Remove the module from the
If the module appears to be damaged, replace it in the
3Com suggests you keep the shipping carton and
2 - 2 ONline Ethernet Bridge Module Installation and Operation Guide