
Installation Procedure
Install the Hardware
Refer to Chapter 4, “Hardware Installation,” and follow the instructions for the installation of the board. Ignore any instructions in Chapter 4 involving the DS1 and DS2 DIP switches, since they have already been done in this procedure.
Load the Software
Power up the system [AT&T Work Group System (WGC) computer] to boot native
Insert the
Use the
As shown in the following screen display, first, shift from the “A” drive to the “C” (system disk) drive and create a directory named IPC as follows.
A : $ C :
C : $ mkdir ipc
C : $