Item | Indicator, Button, or Icon | Description |
| Connector |
|
|
|
|
3 | Sled cover/ GPGPU | Installs up to two GPGPU cards when |
| card assembly | plugged into horizontal GPGPU card risers. |
4 | Sled release latch | Press to release the sled from the enclosure. |
5 | The | |
| power button | power is on.The |
|
| amber when the system critical event occurs. |
|
| NOTE: The |
|
| according to critical system error log (SEL) |
|
| assertion. If the SEL is full or a deassertion |
|
| event occurred while sensor monitoring is |
|
| paused (e.g. fan monitoring is paused during |
|
| system power off), the |
|
| amber. To turn off an amber LED and reset the |
|
| |
|
| green), either perform a BMC cold reset or |
|
| reseat the sled in the server enclosure. |
|
| The power button turns the compute sled on. |
|
| NOTES: |
|
| • When powering on the sled, the video |
|
| monitor can take from several seconds to |
|
| over 2 minutes to display an image, |
|
| depending on the amount of memory |
|
| installed in the system. |
|
| • On |
|
| turning off the sled using the power |
|
| button causes the sled to perform a |
|
| graceful shutdown before power to the |
|
| sled is turned off. |
|
| • To force an ungraceful shutdown, press |
|
| and hold the power button for five |
|
| seconds. |
6 | VGA connector | Connects a VGA display to the system. |
7 | Serial connector | Connects a serial device to the system. |
32
About the System