NovaJet 500/630/700 Series Service Manual
List of Illustrations (cont)
FigurePage
Chapter 3 Maintenance (cont)
3-17. | Test Cartridge Installed | 3-23 |
3-18. Support Bracket Placement | 3-24 |
3-19. | Color Calibration | 3-26 |
3-20. | Utility Menu | 3-27 |
3-21. Color Calib Menu | 3-28 |
3-22. Cyan Vertical Options Menu | 3-28 |
3-23. Slow Deadband | 3-29 |
3-24. Service Menu | 3-30 |
3-25. Calibration (Deadband) Menu (500 Series) | 3-31 |
3-26. Calibration (Deadband) Menu (630/700 Series) | 3-31 |
3-27. | Calibration Menu | 3-33 |
3-28. Color Db Menu | 3-34 |
3-29. Paper Axis Test | 3-36 |
3-30. Diagnostics Menu | 3-37 |
3-31. Accessory Menu | 3-37 |
3-32. NVRAM Clear and Clock Reset Menu | 3-40 |
3-33. MPWA Connections Diagram | 3-45 |
3-34. Carriage PWA Connections Diagram | 3-46 |
3-35. Leg Harness Connections Diagram | 3-47 |
3-36. Leg Harness Connections Diagram (750) | 3-48 |
Chapter 4 Troubleshooting
4-1. | Carriage Board LED D2 Location for NJ 500 Series | 4-19 |
4-2. | Carriage Board LED D2 and D5 Location for NJ 630/700 Series | 4-21 |
Chapter 5 Assembly/Disassembly
5-1. Right Cover Assembly Removal/Installation | 5-3 |
5-2. Left Cover Assembly Removal/Installation | 5-4 |
5-3. Left Cover Assembly Removal/Installation (NovaJet 750) | 5-5 |
5-4. | Keypad and Display Removal/Installation | 5-8 |
5-5. | Keypad and Display Grounding Connection | 5-9 |
5-6. | Extra Memory (SIMM) Removal/Installation | 5-10 |
5-7. MPCB Removal | 5-13 |
5-8. | Power Supply Removal | 5-16 |