NovaJet 500/630/700 Series Service Manual
11.To disengage the Carriage Belt from the Belt Clamp, push the Carriage Belt away from the left post of the Belt Clamp and gently lift up until the bottom edge of the Carriage Belt clears the top of the left post.
12.Push the Carriage Belt away from the right post of the Belt Clamp and gently lift up to finish removing the Carriage Belt from the Belt Clamp.
Failure to use an approved antistatic bag for storage or shipment may cause damage to the MPCB and affect the Warranty.
13.Place the Carriage Assembly in an ESD (antistatic) bag in preparation for shipment to ENCAD for replacement or repair, or if it is to be stored for repair at your facility.
Install the Carriage Assembly, Carriage Belt, and the Frame Tensioner
1.To install the Belt onto the Carriage Assembly, the “bumps” on the belt (where the ends of the belt are joined together to make the belt continuous) must be positioned between the left and right posts of the Belt Clamp. See Figure
2.Slide the Carriage Belt between the right post and the middle post and guide it down into the Belt Clamp. Then slide the Carriage Belt between the left post and the middle post and finish placing the Carriage Belt into the Belt Clamp.
3.Check the position of the Carriage Belt to make sure it matches Figure
4.Make sure the left end of the Trailing Cable extends out beyond the left end of the Trailing Cable Support Assembly.