User’s Manual of WGSD-1022/WGSD-8000

Admin Status

Auto. Point-to-point links are automatically established by the device.

 

Enabled, enables the device to establish a point-to-point link.

 

Disabled, where disables point-to-point link.

Point-to-Point Oper

Indicates the Point-to-Point operating state. To run a migration test, press Activate

Status

next to the Activate Protocol Migration Test field. The test sends Link Control

Protocol (LCP) packets to test if a data link is enabled.

 

 

 

 

 

 

 

To establish communications over a point-to-point link, the originating PPP first sends Link Control

#Note: Protocol (LCP) packets to configure and test the data link. After a link is established and optional facilities are negotiated as needed by the LCP, the originating PPP sends Network Control Protocols (NCP) packets to select and configure one or more network layer protocols. When each of the chosen network layer protocols has been configured, packets from each network layer protocol can be sent over the link. The link remains configured for communications until explicit LCP or NCP packets close the link, or until some external event occurs. This is the actual switch port link type. It may differ from the administrative state.

4.9.5 MSTP Properties

MSTP provides differing load balancing scenarios. For example, while port A is blocked in one STP instance, the same port is placed in the Forwarding State in another STP instance. The MSTP Properties screen (see figure 4-50) contains information for defining global MSTP settings, region names, MSTP revisions, and maximum hops.

Figure 4-50MSTP Properties

The page contains the following fields:

Region Name

Where provides a user-defined STP region name

- 113 –