2.2UPS Cabinet Installation

To install an UPS cabinet, perform the procedures in the following paragraphs.

2.2.1Unloading the Powerware 9330 (10 kVA---20 kVA) UPS Cabinet from the Pallet

The UPS cabinet is bolted to a wooden pallet supported by wood skids. To remove the pallet, perform the following procedure:

WARNING:

The UPS cabinet is heavy. Refer to Drawing 164201300-3 in Appendix A for weight of cabinets. If unloading instructions are not closely followed, the cabinet may cause serious injury.

CAUTION:

Do not tilt cabinets more than 10 degrees from vertical.

1.Use a forklift or other material handling equipment to move the cabinet to the installation area. Insert the forklift jacks between the skids on the bottom of the unit.

2.Remove left front solid panel, and right front vented panel from UPS cabinet. Front panels are secured with magnetic latches and are removed by pulling panels straight forward to disengage magnetic latches (see Figure 2---1).

3.If the leveling feet are not fully retracted, turn the leveling feet until they are retracted.

4.Remove three bolts, (1) in Figure 2---2, securing the rear shipping bracket (3) to the cabinet and three bolts (2) securing the bracket to the pallet. Remove the rear shipping bracket. If installing cabinet permanently, retain shipping brackets and securing hardware for later use.

5.Remove three bolts, (1) in Figure 2---1, securing front shipping bracket (3) to the pallet. Do not remove bolts (2) securing the bracket to the cabinet.

6.Remove three bolts, (4) in Figure 2---2, securing removable skid (5) and remove skid.

NOTE: In the following step the pallet will tilt and act as a ramp once the cabinet is rolled beyond the the center of the pallet. Make sure to restrain the cabinet as it continues to roll down the pallet/ramp. The front shipping bracket will act as a brake to assist restraining the cabinet.

WARNING:

Do not stand directly behind the pallet while unloading the cabinet If unloading instructions are not closely followed, the cabinet may cause serious injury.

7.Slowly roll the cabinet toward the rear of the pallet. Once the pallet tilts, continue rolling the cabinet down the pallet until the cabinet is clear of the pallet.

2--2