1.1.5Inspecting and Unpacking Each Cabinet

The first task in preparing for installation is inspecting and unpacking the UPS sections. The UPS and accessory cabinets are shipped bolted to wooden pallets, as shown in Figures 1---1 or 1---2, and protected with outer protective packaging material.

Figure 1 ---1. Powerware 9330 (10 kVA ---20 kVA) UPS Cabinet as Shipped on Pallet

Powerware 9330 (10 kVA--40 kVA) Installation and Operation

1--3

164201300 REV. G 061502

 

Page 23
Image 23
Powerware 9330 operation manual Inspecting and Unpacking Each Cabinet