1.1.5Inspecting and Unpacking Each Cabinet
The first task in preparing for installation is inspecting and unpacking the UPS sections. The UPS and accessory cabinets are shipped bolted to wooden pallets, as shown in Figures
Figure 1 ---1. Powerware 9330 (10 kVA ---20 kVA) UPS Cabinet as Shipped on Pallet
Powerware 9330 (10 | |
164201300 REV. G 061502 |
|