NOTE: Remove Options cabinet PDM conduit landing plate to punch conduit holes.

15.Install Square-D Type QO or QOB breakers into PDM panelboard. Refer to Appendix A of this manual for access information.

16.Wire branch circuits in accordance with branch circuit breaker manufacturers instructions (output from the UPS or Options cabinet is prewired to the PDM). Refer to Appendix A of this manual wiring access information.

17.After wiring the Options cabinet to the facility power and critical load, be sure to ground the system according to local and/or national electrical wiring codes.

18.When all wiring is complete, connect battery strings in accordance with instructions contained in paragraphs 3.4.1 and 3.4.2 of Chapter 3.

19.Secure the UPS by reinstalling safety shield panels, front vented panels, and front solid panel.

20.Install side panel removed from the UPS cabinet to the left side of the Options cabinet.

21.Secure the Options cabinet by reinstalling front vented panel.

2.5Initial Startup

Startup and operational checks should be performed only by authorized service personnel. Contact service in advance (usually a two week notice is required) to reserve a preferred startup date.

2.6Completing the Installation Checklist

The final step in installing your UPS system is completing the following Installation Checklist. This checklist ensures that you have completely installed all hardware, cables, and other equipment. Completing all items listed on the checklist will ensure a smooth installation. You should make a copy of the Installation Checklist before filling it out, and retain the original.

After your installation is complete, a service representative will be able to verify the operation of your UPS system and commission it to support your critical load. The service representative cannot perform any installation tasks other than verifying software and operating setup parameters. Service personnel may request a copy of the completed Installation Checklist to be sure you have completed all applicable equipment installation.

NOTE: The Installation Checklist MUST be completed prior to starting the UPS system for the first time.

2--28

Powerware 9330 (10 kVA--40 kVA) Installation and Operation

 

164201300 REV. G 061502

Page 54