4220 Flow Meter

Section 3 Installation

Teledyne Isco offers a special optional connect cable to power the flow meter from a separate battery. Mount the battery securely, in an upright position, so it will not inadvertently tip over, or be at risk of having its cable pulled off.

CAUTION

Be sure of proper polarity before attaching clips to the battery. Never attach the flow meter to a source of unknown polarity or voltage. If in doubt, check with a reliable DC voltmeter. Never attach the flow meter directly to an AC power source of any voltage under any circumstances. Charge the battery in accor- dance with the manufacturer's instructions.

Figure 3-3 4220 Flow Meter Suspended by the Handle (handles may vary)

3.3Flow Meter Mounting and Installation Procedures

Because the 4220 Flow Meter is a portable device, you may or may not install it permanently. You can suspend the flow meter in temporary installations, such as sewers, or mount it perma- nently in other installations, such as treatment plants, at your option.

3.3.1 Carrying Handle

To help you carry and install the flow meter, a handle is provided

 

in the accessory package.

3-7

Page 89
Image 89
Teledyne 4220 installation and operation guide Flow Meter Mounting and Installation Procedures, Carrying Handle