4220 Flow Meter

Section 4 Submerged Probe Installation

Figure 4-2 Spring Ring Preparation

w o Fl

Figure 4-3 Mounting Ring in a Round Pipe

CAUTION

Make sure the sensor cable is securely fastened along the back (downstream) edge of the ring. Otherwise, the sensor may provide inaccurate level readings under conditions of high velocity.

Do not overtighten the plastic cable ties; they should be tight- ened just enough to secure the cable in place, without greatly indenting the cable. Overtightening the plastic ties may col- lapse the reference tube in the cable, blocking it.

4-5

Page 99
Image 99
Teledyne 4220 installation and operation guide Spring Ring Preparation