Xantrex Technology XG 850 manual Non-isolated Resistive Programming of Voltage Calibration

Models: XG 850

1 286
Download 286 pages 62.54 Kb
Page 211
Image 211

Calibration and Troubleshooting

Non-isolated Resistive Programming of Voltage Calibration

Important: For maximum accuracy at a specific APG level. Follow the calibration procedure again but use the intended operating resistance level in steps 2 and 3.

To calibrate the non-isolated resistive programming of voltage:

1.Disconnect the load and connect the voltmeter to the output.

2.Connect the 4.000kΩ resistor to the non-isolated connector, resistive programming of voltage, and voltage programming (J1.9-J1-11, and J1.7).

3.Set the resistive APG level to 4kΩ. The SCPI command is:

SYST:COMM:APR:LEV 4

4.Set the input source as Resistive Non-Isolated for Voltage Programming. The SCPI command is:

SYST:REM:SOUR ARES

5.Turn the main output On by pressing the OUTPUT ENABLE Main button on the front panel or send the command:

:OUTP ON

The OUTPUT ENABLE Main button will illuminate.

6. Enter the interactive calibration mode by sending the SCPI command:

CAL:OUTP:ANAL:RES

7.Press the terminal keys – or + to reduce or increase main output voltage value. Adjust the main output voltage to 100%.

8.Press any key other than the + or – keys to exit from interactive calibration mode.

6

M370078-01

6-13

Page 211
Image 211
Xantrex Technology XG 850 manual Non-isolated Resistive Programming of Voltage Calibration