
Installation
Step 5: Performing Functional Tests
The functional test procedures include:
•
•Voltage mode operation and current mode operation checks.
For information on local operation, see “Local Operation” on page
Powering the Power Supply On/Off
To power on the power supply:
1.Ensure that the front panel power switch is in the Off position.
2.Ensure that the AC line voltage is within operating range.
3.Connect the line cord to a grounded AC outlet.
4.Turn the front panel power switch to the On position.
After a short
After approximately 1 second, the display returns to normal status.
To power off the power supply:
◆Turn the front panel power switch to the Off position.
AC FAIL will blink on the display. The ALARM LED illuminates. After a short delay, all lights on the display will not be illuminated.