Remote Operation
5-16 M370078-01
Multiple Power Supply Setup
Master Setup:
Configure the master XG by selecting the communication interface
you wish to use to communication with the Master and follow the
setup instruction in this chapter.
Slave Setup:
1. Turn the 9-position mode control to PGM.
rE is displayed in the output voltage display.
2. Turn the rotary Adjust/Enter control to select SLA and press the Enter
button.
3. Set a unique address. See “Multichannel Address Setting” on page 5–
21.
Important:
If either RS-232 or RS-485 are used for communication with the
master, the data rate must be configured for 9600 bps to properly communicate
with the slave units.