Chapter 4: Installing Components

Preparing to install components

Selecting a place to work

Work on your server in an area that:

■Is clean (avoid dusty areas)

■Is a low-static environment (avoid carpeted areas)

■Has a stable surface on which to set your server

■Has enough room to place all of your server parts

■Is near a grounded outlet so you can test your server after installation

■Is near a telephone (in case you need help from Gateway Technical Support). The telephone must be directly connected to a telephone jack and cannot be connected to your server.

Gathering the tools you need

Some tools and supplies that you may need to work on your server are:

■A notebook to take notes

■A Phillips screwdriver

■A small flat-blade screwdriver

■Small containers to store various types of screws

■A grounding wrist strap (available at most electronic stores)

40

www.gateway.com

Page 46
Image 46
Gateway 960 manual Preparing to install components, Selecting a place to work, Gathering the tools you need