Gateway 960 manual Installing a voltage regulator

Models: 960

1 157
Download 157 pages 48.48 Kb
Page 75
Image 75
Installing a voltage regulator
Follow the instructions in “Closing the server case” on page 45.
www.gateway.com
7
Follow the instructions in “Opening the server case” on page 42. If you are installing a new voltage regulator, go to Step 5.
2
3
Installing a voltage regulator
To install a voltage regulator:
1 Follow the instructions in “Preventing static electricity discharge” on page 41.
- OR -
If you are replacing a voltage regulator, on each end of the voltage regulator support bracket, pinch the sides together, then lift the bracket away from the server. You may need to first remove a heat sink or some memory modules in order to access the sides of the support bracket.
4 Lift the voltage regulator away from the system board.
5 Insert the new voltage regulator into the voltage regulator slot, then replace the support bracket.
6 If you removed a heat sink or some memory modules in Step 3, replace them.

Installing a voltage regulator

69

Page 75
Image 75
Gateway 960 manual Installing a voltage regulator