
Maintaining | 9 |
Routers |
|
This chapter lists the tools, items, and steps needed for installing and uninstalling
Topic | Page |
Required Tools and Items | |
|
|
Storing Modules and Components | |
|
|
Cleaning the System | |
|
|
Upgrading NVS Cards on SRP Modules | |
|
|
Upgrading Memory on SRP Modules | |
|
|
Replacing SFPs on GE I/O Modules | |
|
|
Replacing Fan Trays | |
|
|
Installing a | |
|
|
Required Tools and Items
You will need the following tools and other items to replace
•Flathead and Phillips screwdrivers
•Insulated adjustable wrench
•Antistatic wrist strap
•Antistatic bags (or other protective packaging to hold components)
•Plastic boots or other protective cover for