
CHAPTER 7
Powering Up
Table
Installation Task | Page |
|
|
Warning: Be sure the power source is turned off and the system is turned off before performing the following task.
Connect DC power or AC power to your | |
(depending on model) |
|
|
|
Cable all line modules. | |
|
|
Powering Up
Note: This procedure assumes that the system is already connected to a power source. See Chapter 6, Cabling the
For specifications on the electrical requirements for the system, see Chapter 11, System Specifications. For details on the power consumed by the different
Branch Circuit Caution: Evaluate the overall loading of the branch circuit before you install any equipment into a rack.
To power up the system:
1Verify that the power source is operational and turned on.
2Inspect all grounding and power connections to the
3Confirm that all connections are secure.
4Switch the power switches to ON.
5Monitor the LEDs on the front of the SRP modules to verify that the system is booting properly. See Table
When the prompt appears on the system console, the system is in
User Exec mode and is ready to be configured:
host1>
6Enter the enable command to access Privileged Exec mode:
host1>enable
host1#
In Privileged Exec mode you can begin to configure the system. See the