
Complete Hardware Guide for EX8208 Ethernet Switches
an EX8208 switch in a
NOTE: The EX8216 switch can be installed only in a
The power cord tray provides support for the front of the EX8208 chassis during installation of the switch in a
The power cord tray provides a place to organize and tie down the power cords for the power supplies.
The power cord tray uses 1 U of rack space, so the total space occupied by an EX8208 switch chassis and power cord tray is 15 U, and the total space occupied by an EX8216 switch chassis and power cord tray is 22 U.
Ensure that you have the following tools and parts available to install the power cord tray:
•A Phillips (+) screwdriver, number 1, 2, or 3, depending on the size of your rack mounting screws
•4 mounting screws appropriate for your rack to attach the power cord tray to the rack
To install the power cord tray (see Figure 44 on page 137 and Figure 45 on page 137):
1.Remove the power cord tray from the accessory box.
2.Decide where to position the switch in the rack. If the rack is empty, choose the lowest possible location. See “Rack Requirements for an EX8208 Switch” on page 97, Rack Requirements for an EX8216 Switch, “Cabinet Requirements and Specifications for an EX8208 Switch” on page 100 and Cabinet Requirements and Specifications for an EX8216 Switch.
NOTE: To mount an EX8208 switch on a
3.Position the power cord tray in the rack space immediately below the position in which you want to install the switch (in a
136 | Copyright © 2010, Juniper Networks, Inc. |