Complete Hardware Guide for EX8208 Ethernet Switches

Table 36: Site Preparation Checklist (continued)

Item or Task

For More Information

Performed By

Date

Calculate the power consumption and requirements.

Rack or Cabinet

Select the type of rack or cabinet and verify that it meets the minimum requirements for the installation of the switch.

Plan rack or cabinet location, ensuring the required space clearances.

“AC Power Specifications for EX8200 Switches” on page 109

“DC Power Specifications for EX8200 Switches” on page 110

“Power Requirements for EX8208 Switch Components” on page 111

Power Requirements for EX8216 Switch Components

“Calculating Power Requirements for an EX8208 Switch” on page 114

Calculating Power Requirements for an EX8216 Switch

“Calculating the EX8200 Switch Fiber-Optic Cable Power Budget” on page 120

“Calculating the EX8200 Switch Fiber-Optic Cable Power Margin” on page 121

“Rack Requirements for an EX8208 Switch” on page 97

Rack Requirements for an EX8216 Switch

“Cabinet Requirements and Specifications for an EX8208 Switch” on page 100

Cabinet Requirements and Specifications for an EX8216 Switch

“Clearance Requirements for Airflow and Hardware Maintenance for an EX8208 Switch” on page 101

Clearance Requirements for Airflow and Hardware Maintenance for an EX8216 Switch

92

Copyright © 2010, Juniper Networks, Inc.

Page 118
Image 118
Juniper Networks EX8208 manual Item or Task For More Information Performed By Date, Rack or Cabinet