Complete Hardware Guide for EX8208 Ethernet Switches

Part 2

Planning for Switch Installation

 

Chapter 5

Rack and Cabinet Requirements

. 97

 

Figure 33: Installing an EX8208 Switch in a Four-Post Rack

. 99

 

Figure 34: Installing an EX8208 Switch in a Two-Post Rack

. 99

 

Figure 35: Airflow Through the EX8208 Switch Chassis

102

 

Figure 36: Clearance Requirements for Airflow and Hardware Maintenance for

 

 

an EX8208 Switch Chassis

103

Chapter 7

Planning Power Requirements

109

 

Figure 37: AC Plug Types

. 113

Part 3

Installing and Connecting the Switch and Switch Components

Chapter 8

Installing the Switch

125

 

Figure 38: Pallet Fastener

127

 

Figure 39: Unpacking an EX8208 Switch

128

 

Figure 40: Unpacking an EX8216 Switch

129

 

Figure 41: Adjustable Mounting Brackets for Four-Post Rack Installation

134

 

Figure 42: Adjustable Mounting Brackets Installed in a Four-Post Rack (EX8208

 

 

Switch)

135

 

Figure 43: Adjustable Mounting Brackets Installed in a Four-Post Rack (EX8216

 

 

Switch)

135

 

Figure 44: Installing the Power Cord Tray in a Four-Post Rack

137

 

Figure 45: Power Cord Tray Installed in a Two-Post Rack

137

 

Figure 46: Installing an EX8208 Switch in a Two-Post Rack

140

 

Figure 47: Installing an EX8208 Switch in a Four-Post Rack

140

 

Figure 48: Installing the EX8208 Switch Chassis Using a Mechanical Lift

142

 

Figure 49: Lifting an EX8208 Switch Chassis Without Using a Mechanical Lift . .

145

 

Figure 50: Installing an EX8208 Switch in a Four-Post Rack

146

 

Figure 51: Installing an EX8208 Switch in a Two-Post Rack

147

Chapter 9

Installing Switch Components

149

 

Figure 52: Installing an AC Power Supply in an EX8200 Switch

152

 

Figure 53: Installing a DC Power Supply in an EX8200 Switch

154

 

Figure 54: Installing a Fan Tray in an EX8208 Switch

155

 

Figure 55: Installing an SRE Module in an EX8208 Switch

157

 

Figure 56: Installing an SF Module in an EX8208 Switch

159

 

Figure 57: Unpacking a Line Card Used in an EX8200 Switch

160

 

Figure 58: Location of the ESD Point on an EX8200 Switch Chassis

161

 

Figure 59: Closed and Open Positions of the 2-in. Ejector Lever

162

 

Figure 60: Installing a Line Card with a 2-in. Ejector Lever

162

 

Figure 61: Installing a Line Card with a 4-in. Ejector Lever

163

 

Figure 62: Installing a Transceiver in an EX Series Switch

165

 

Figure 63: Connecting a Fiber-Optic Cable to an Optical Transceiver Installed in

 

 

an EX Series Switch

166

Chapter 10

Connecting the Switch

167

 

Figure 64: Connecting a Grounding Cable to an EX Series Switch

167

 

Figure 65: Connecting the Grounding Lug to an EX4200 Switch on a Four-Post

 

 

Rack

170

xiv

Copyright © 2010, Juniper Networks, Inc.

Page 14
Image 14
Juniper Networks manual Installing an EX8208 Switch in a Four-Post Rack