McDATA® Sphereon 3032 and 3232 Fabric Switches Installation and Service Manual
i-6
Index
full-volatility feature 4-36
PFE key 2-132

G

gateway address
change switch address 2-117
configuring 2-15
default 2-1, 3-1, 4-2
EFC Server default 2-53
gateway address, default value 2-3

H

hardware log 1-35, 4-9
Hardware View 4-23
hardware view 1-38
alert symbol function 1-38
displayed 1-38
status conditions 1-38
using 1-38
help
about option 1-38
contents option 1-37
help menu 1-37
hop counts 2-80

I

icon
view 1-38
identification
configure at SANpilot interface 2-110
default values 2-2
illustrated parts breakdown 6-1
IML button 1-19
IML button, description of operation 1-21
IML procedure 4-43
inband management access methods 1-4
inband switch management
FICON management style 1-29
open systems management style 1-29
Incompatible operating parameters 1-9
Incompatible zoning configurations 1-9
indicators on the switch 1-21
initial microcode load
See IML
initial program load
See IPL
initial program load (IPL) 1-36
insistent domain ID 2-79, 2-80, 2-114
installation options 2-4
installation tasks
assigning user names and passwords 2-47
backing up configuration data 2-103
backing-up configuration data 2-103
cabling fibre channel ports 2-134
configuring
network addresses 2-14
network information 2-14
switch from the embedded web server
2-106
the Product Manager Application 2-76
the switch from the embedded web serv-
er 2-106
connecting switch to fabric director 2-135
LAN-connecting the switch 2-21
recording and verifying EFC Server
restoration information 2-53
recording EFC Server restoration information
2-53
setting EFC Server date and time 2-44
setting switch date and time 2-74
summary 2-5
Task 11 - Configure the call-home feature
2-46
Task 13 - Configure the switch to the
Management application 2-51
Task 25 - Register with the McDATA file
center 2-137
Task 7 - Configure EFC Server password and
network addresses 2-25
Task 8 - Configure Management Server
information 2-30
Task 9 - Configure Windows 2000 users 2-38
testing remote notification 2-102
unpacking, inspecting, and installing
the EFC Server 2-22
the switch 2-12
verify installation requirements 2-7
verifying switch-to-EFC Server
communication 2-55
internal loopback tests 4-29
interop mode 2-84, 2-116
interswitch link