
8. RACK MOUNTING
Use the optional
M4 x 12 binding head screw (supplied with the
M5 x 12 binding head screw | |
(supplied with the |
M5 fiber washer
(supplied with the
Note
•Use the Digital Video Recorder in locations with ambient temperature of between +5°C and +40°C (41°F and 104°F). When
•Be sure to mount the Digital Video Recorder below the heat generating components, and mount the perforated panel between the Recorder and such a heat generating component as required.
•The Digital Video Recorder has a
•Avoid installing the Digital Video Recorder in locations exposed to vibration.
a)Elevated Operating Ambient Temperature - If installed in a closed or
b)Reduced Air Flow - Installation of the equipment in a rack should be such that the amount of air flow required for safe operation of the equipment is not compromised.
c)Mechanical Loading - Mounting of the equipment in the rack should be such that a hazardous condition is not achieved due to uneven mechanical loading.
d)Circuit Overloading - Consideration should be given to the connection of the equipment to the supply circuit and the effect that overloading of circuits might have on overcurrent protection and supply wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing this concern.
e)Reliable Earthing - Reliable earthing of
19