3 Tests and Diagnostics

3.21 Running Test

3. After specifying of the Serial #A test, the following message will appear:

Mount the work disk(s) on the drive(s), then press [Enter] key.

[Warning : The contents of the disk(s), will be destroyed.]

4.This program is executed in the above mentioned ways. To terminate the program, press Ctrl + Break.

3-50

PORTEGE R100 Maintenance Manual (960-440)

Page 140
Image 140
Toshiba R100 manual Mount the work disks on the drives, then press Enter key