Toshiba R100 Procedure 3 Diagnostic Test Program Execution Check, Procedure 4 Replacement Check

Models: R100

1 292
Download 292 pages 16.93 Kb
Page 63
Image 63

2.4 System board Troubleshooting

2 Troubleshooting

Procedure 3 Diagnostic Test Program Execution Check

Execute the following tests from the Diagnostic Test Menu. These tests check the System board and I/O unit. Refer to Chapter 3, Tests and Diagnostic, for more information on how to perform these tests.

1.System test

2.Memory test

3.Keyboard test

4.Display test

5.Floppy Disk test

6.ASYNC test

7.Hard Disk test

8.Real Timer test

9.NDP test

10.Expansion test

11.Sound/LAN/Modem test

If an error is detected during these tests, go to Procedure 4.

Procedure 4 Replacement Check

I/O units or System board may be damaged. Replace the I/O units or disassemble the computer following the steps described in Chapter 4 and replace the System board with a new one.

PORTEGE R100 Maintenance Manual (960-440)

2-27

Page 63
Image 63
Toshiba R100 manual Procedure 3 Diagnostic Test Program Execution Check, Procedure 4 Replacement Check