Toshiba R100 manual System Test

Models: R100

1 292
Download 292 pages 16.93 Kb
Page 99
Image 99

3.4 System TestSystem Test

3 Tests and Diagnostics

3.4System Test

To execute the System Test, select 1-SYSTEM TEST from the DIAGNOSTIC TEST MENU, press Enter and follow the directions on the screen. The System test contains seven subtests. Move the highlight bar to the subtest you want to execute and press Enter.

Subtest 01

ROM Checksum

 

This subtest executes a checksum test of the BIOS ROM (range: F0000h to

 

FFFFFh, 64KB) on the System Board.

Subtest 04

Fan On/Off

 

This subtest checks CPU fan operation using the on/off command. The

 

following message will appear when this subtest is executed. Make sure the

 

fan does not rotate and press Enter.

 

*** Test Fan Revolution 0000RPM Start

 

The following message will appear. Make sure the fan rotates at low speed

 

and press Enter.

 

*** Test Fan Revolution Low speed start

 

The following message will appear. Make sure the fan rotates at high speed

 

and press Enter.

 

*** Test Fan Revolution High speed start

Subtest 05

Gerserville

 

If the CPU supports Gerserville (SpeedStep), this Subtest checks that the CPU

 

operating clock speed can be changed.

Subtest 06

Quick charge

 

This subtest checks the status for the quick charge.

PORTEGE R100 Maintenance Manual (960-440)

3-9

Page 99
Image 99
Toshiba R100 manual System Test