3.16 Sound/LAN/Modem Test | 3 Tests and Diagnostics |
....Press test number |
|
To execute a subtest continuously, select the test number and press Enter. To exit the Sound/Modem test, remove the test program disk from the USB FDD and turn the computer off.
Subtest 03 LAN
This subtest checks the operation of
The large “OK” is displayed if no error occurred.
Subtest 04 MODEM
For this subtest, connect the modem PCB and RJ11 connector with a harness. This subtest contains the following tests. They are tested with the dedicated
•
•
•
•
•
Scorpio Modem Initialize Digital Loopback Test Modem Sound Test External Loopback test RJ11 Connector Test (LED)
To finish the Sound/LAN/Modem test, the power of the computer is turned off.
PORTEGE R100 Maintenance Manual |