START-UP CHECKLIST FOR 30XW LIQUID CHILLERS

START-UP CHECKLIST FOR 30XW LIQUID CHILLERS

A. PROJECT INFORMATION

Job Name ________________________________________________________________________________________

Address __________________________________________________________________________________________

City ________________________________ State ________________________ Zip ___________________________

Installing Contractor ________________________________________________________________________________

Sales Office _______________________________________________________________________________________

Start-up Performed By ______________________________________________________________________________

Design Information

 

CAPACITY

EWT

LWT

FLUID TYPE

FLOW RATE

P.D.

Evaporator

 

 

 

 

 

 

Condenser

 

 

 

 

 

 

Unit

Model _______________________________________ Serial ______________________________________

Compressors

Compressor A

Model _______________________________________ Serial ______________________________________

Compressor B

Model _______________________________________ Serial ______________________________________

Evaporator

Model _______________________________________ Serial ______________________________________

Condenser

Model _______________________________________ Serial ______________________________________

B. PRELIMINARY EQUIPMENT CHECK (This section to be completed by installing contractor)

1. Is there any physical damage?

Yes

No

 

Will this prevent start-up?

Yes

No

 

Description

 

 

 

___________________________________________________________________________________________

 

___________________________________________________________________________________________

2.

Unit is installed level as per the installation instructions.

Yes

No

3.

Power supply agrees with the unit nameplate.

Yes

No

4.

Correct control voltage ________vac.

Yes

No

5.

Electrical power wiring is installed properly.

Yes

No

6.

Unit is properly grounded.

Yes

No

7.

Electrical circuit protection has been sized and installed properly.

Yes

No

8.

All terminals are tight.

Yes

No

9.

All plug assemblies are tight.

Yes

No

10.

All cables, thermistors and transducers have been inspected for cross wires.

Yes

No

11.

All thermistors are fully inserted into wells.

Yes

No

12.

Relief valve vent piping per local codes.

Yes

No

13.

Mechanical room temperature maintained above 50 F (10 C).

Yes

No

Chilled Water System Check

1.

All chilled water valves are open.

Yes

No

2.

All piping is connected properly.

Yes

No

3.

All air has been purged from the system.

Yes

No

4.

Chilled water pump is operating with the correct rotation.

Yes

No

5.

Chilled water pump starter interlocked with chiller.

Yes

No

6.

Chilled water flow switch operational.

Yes

No

7.

Inlet piping to evaporator includes a 20 mesh strainer within 10 ft.

Yes

No

8.

Water loop volume greater than 3 gal/ton for air conditioning

Yes

No

 

or 6 gal/ton for process cooling and low ambient operation.

9.

Proper loop freeze protection provided to ____ °F (°C) for brine applications.

Yes

No

 

Antifreeze type__________________ Concentration _____%.

Yes

No

10.

Outdoor piping wrapped with electric heater tape.

Yes

No

Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.

Catalog No. 04-53300024-01

Printed in U.S.A.

Form 30XW-1T

CL-1

11-09

Replaces: New

Page 141
Image 141
Carrier 30XW150-400 START-UP CHECKLIST FOR 30XW LIQUID CHILLERS A. PROJECT INFORMATION, Design Information, Unit