powering up an array 4–16

Powering Up and Checking LEDs 4–16power-off procedure 4–33

power-on sequence 4–32preinstallation worksheet 2–6Product and Architecture Overview 1–1protocols

Fibre Channel 1–12

R

rack-mounting an array cabinet-mounting an array 3–3

RARP 4–27Rear-Panel LEDs 6–5

Recovering From Fatal Drive Failure 8–8redundant controller

explained 8–8redundant loops A–4release notes 1–15requirements

environmental 2–3Reset button 8–7reset button

pressing 8–10

silencing failed component alarms 8–6RJ-45 connector D–1

RS-232

connecting to 4–26,F–1,I–2RS-232 port 4–25

S

safety precautions 2–2SATA array

features 1–4sensor locations 8–1sensors

cooling element 8–2power supply 8–5temperature 8–3voltage 8–4

serial cable

null modem 4–26serial port

parameters 4–26

serial port connection E–1,F–1,I–1

serial port parameters E–2,F–2,G–2,H–2,H–3,I–2, I– 3

SES version conflict 6–4

Setting Loop IDs on Expansion Units 4–13,B–4SFP connectors 4–31

inserting in ports 4–24,B–9

show network-parameters CLI command 4–26silencing alarms 8–6

Simple Network Management Protocol 4–26site planning 2–1

console requirement 2–5customer obligations 2–1EMC 2–3environmental 2–3layout 2–4

physical 2–4

safety precautions 2–2site preparation survey 2–6SNMP 4–26

software tools 1–15specifications

clearances 2–4physical (array) 2–4

specifications (product) A–2switch

ID 4–13,B–4

T

temp LED 6–3temperature

environmental range 2–3temperature LED 6–3topologies

Fibre Channel 1–12troubleshooting 8–1

disks not visible 8–7flowcharts 8–11LUNs not visible 8–7

U

upgrading firmware 7–7

V

VERITAS DMP, enabling 7–3

Veritas software 7–3

VT100 terminal connection 4–26

4 SANnet II 200 FC, SATA, and SATA SE Array Installation, Operation, and Service Manual • March 2005

Page 208
Image 208
Dot Hill Systems II 200 FC service manual Serial port parameters E-2,F-2,G-2,H-2,H-3,I-2, I