Dot Hill Systems II 200 FC service manual Unpacking Your Array, Opening Your Package, Chapter

Models: II 200 FC

1 210
Download 210 pages 50.54 Kb
Page 45
Image 45
Unpacking Your Array

CHAPTER 3

Unpacking Your Array

This chapter describes the procedure for unpacking your FC, SATA, or SATA SE array package. The following topics are covered in this chapter:

“Opening Your Package” on page 3-1

“Checking the Package Contents” on page 3-2

“Field-Replaceable Units” on page 3-3

“Customer-Provided Cables” on page 3-3

“Mounting Your Array in a Rack or Cabinet” on page 3-3

3.1Opening Your Package

Follow these guidelines for unpacking the equipment.

Caution – To avoid personal injury or damage to the equipment during installation, always use two people to remove the unit from its container. This unit weighs approximately 60 pounds (27 kg).

1.Select a suitable area for unpacking.

2.Store all packing material and boxes for possible equipment returns.

3.Check the contents sheet in your product package.

The contents sheet summarizes the standard contents for your product. See “Checking the Package Contents” on page 3-2for more information.

4.Compare the packing slip and the list of parts with the items you received.

If the list of parts on your packing slip does not match the items you received, or if any items appear damaged, immediately notify your carrier agent and the supplier who prepared your shipment.

5.Carefully examine the cables provided in the package.

If any cable appears to be damaged, contact the technical service department for an immediate replacement.

3-1

Page 45
Image 45
Dot Hill Systems II 200 FC service manual Unpacking Your Array, Opening Your Package, Chapter