Dot Hill Systems II 200 FC service manual 4 Site Preparation Worksheet

Models: II 200 FC

1 210
Download 210 pages 50.54 Kb
Page 43
Image 43
Table 2-4Site Preparation Worksheet

Table 2-4Site Preparation Worksheet

Rackmounting Customers must ensure that the appropriate service outlets are available for installation. Requirements vary.

Will the array be rackmounted? Yes / No

Is the rack supplied by Dot Hill, Inc.? Yes / No

If yes, include Dot Hill model number: ____

If not, make/model: _____________________ /_____________________

Does the rack mount have:

Front and back? If so, depth? ______

Center/Telco? ______

What cable lengths are required? _________________

Are there any power strips or power sequencers in the rack? Yes / No

Are they supplied by Dot Hill, Inc.? Yes / No

If yes, part number: ___________

If not, quantity of plugs/outlets required: __________ / __________

IP address

Array IP address: ______.______.______.______

 

Array network mask: ______.______.______.______

Cabling

Fiber-optic cable lengths to connect to hosts: _______________

 

 

Chapter 2 Site Planning 2-7

Page 43
Image 43
Dot Hill Systems II 200 FC service manual 4 Site Preparation Worksheet