8.Lift the bezel into position and press it onto the front of the chassis until it is flush with the front.

9.Use the key to lock both bezel locks.

4.7Powering Up and Checking LEDs

Perform the initial check of the array according to the following procedure.

1.Connect two AC or DC power cables to the power and fan modules on the back of the array.

2.Power on the array by turning on each power switch.

See “Power-On Sequence” on page 4-32for the power-up sequence to use when operating RAID arrays and expansion units. See “Connecting SANnet II 200 FC JBOD Arrays” on page B-6for the power-up sequence to use when operating standalone SANnet II 200 FC JBODs directly attached to hosts.

3.Check for the following LED activity:

All front-panel LEDs turn solid green to indicate good operation.

Disk 0

Disk 1

Disk 2

Disk 3

Disk 4

Disk 5

Disk 6

Disk 7

Disk 8

Disk 9

Disk 10

Disk 11

Figure 4-11Front Panel of the SANnet II 200 FC, SATA, and SATA SE Array With LEDs Displayed

See Chapter 6 for more information about your array’s LEDs.

4.8Reviewing Channels, Ports, and SFPs

I/O controller modules have ports that accept small form-factor pluggable (SFP) transceivers. The SANnet II 200 FC and SATA arrays have ports labeled FC0 through FC5, to indicate channels 0 through 5. The SANnet II 200 SATA SE array has ports

4-16SANnet II 200 FC, SATA, and SATA SE Array Installation, Operation, and Service Manual • March 2005