Conductivity/Resistivity Analyzer/Controller
Step
7
9
10
11
12
13
Screen
MENU
CONFIGURATION
CALIBRATION
MAINTENANCE
I/O SETUP
DIAGNOSTICS
PREV NEXT
MAINTENANCE
OFFLINE FUNCTIONS
INSTRUMENT SETUP
LEAD RESISTANCE COMP
DIAGNOSTICS
PREV NEXT
|
|
|
|
|
|
|
|
|
| ||||
| DISPLAY TEST |
|
|
| ||
| KEYBOARD TEST |
|
|
| ||
| OUTPUT/RELAY TEST |
|
| |||
| OUTPUT CALIBRATON |
|
| |||
|
|
|
|
| ||
| DIAGNOSTICS |
|
|
| ||
|
| PREV | NEXT |
|
| |
|
|
|
| |||
|
|
|
|
|
|
|
|
| OUTPUT TEST |
| |||
| 01 | 02 | 03 | R1R2R3R4 |
| |
| 0 | 0 | 0 | A A A A |
| |
| 25 | 0 | 0 | A A A A |
| |
| 50 | 25 | 0 | A A A A |
| |
| 75 | 50 | 25 | A A N A |
| |
| DIAGNOSTICS |
| ||||
|
| NEXT |
| |||
|
|
|
|
|
|
|
OUTPUT TEST
01 02 03 R1R2R3R4
100 75 50 A A A N
0 100 75 A N A A
00 100 A A N A
00 0 A N N N DIAGNOSTICS
PREV
Action
Go to MAINTENANCE
OUTPUT/RELAY TEST.
Select the combination of output values to be supplied to the terminals, or go to the next window for additional choices.
When one of the rows of output combinations has been selected, observe the meter readings to check that the analog output values match those selected. Also listen for the “click” of an energized relay.
If the results of the analog output test are not satisfactory, recalibrate the output’s zero and span using the procedure in 10.2.
If the results of the relay output test are not satisfactory, consult Honeywell for assistance.
Select one of these combinations, or use the specified function key to return to the previous display.
If only one meter is available, so that only one output can be tested at a time, then for each analog output repeat Steps 1 through 9, including powering down the unit before changing the connections to the output terminals.
When output testing has been completed,
Replace the safety cover and secure it with the screw.
Close the case and power up the unit. Do not apply power
until case is closed.
9782 Series Conductivity/Resistivity Analyzer/Controller - Operator’s Manual | 7/99 |