I/O Setup and System Configuration

Table 5-5 Procedure for Configuring DAT Control

Step

1

Screen

MENU

CONFIGURATION

CALIBRATION

MAINTENANCE

I/O SETUP

DIAGNOSTICS

PREV NEXT

Action

Go to CONFIGURATION DISCRETE CONTROL DAT.

2

3

CONFIGURATION

CAT/RETRANSMISSION

ALARMS

DISCRETE CONTROL

ADVANCED FEATURES

DIAGNOSTICS

PREV NEXT

DISCRETE CONTROL

ON/OFF

PFT

DAT

DIAGNOSTICS

 

 

 

 

 

 

 

 

 

 

 

 

DAT CONTROL

 

 

CYCLE PERIOD

200 S

 

 

DAT1

 

 

 

 

DAT2

 

 

 

 

 

 

 

 

DIAGNOSTICS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ON/OFF CYCLE TIMER 1

 

 

OUTPUT

 

RLY2

 

 

INPUT

 

C1

 

 

SETPOINT

 

15000 µS

 

 

PB LIMIT

 

250 µS

 

 

 

 

 

 

DIAGNOSTICS

 

 

 

 

 

 

 

 

 

 

ATTENTION: Any value entered for one of these control- related parameters will take effect as soon as it is entered.

Specify the length of the cycle period (in seconds) for the time-proportioned control.

Use this screen to select the DAT control output to be configured.

The relay assigned to this DAT control output during I/O setup will already be filled in. (This is read-only information.)

Specify the process value or computed value to be used as the input.

Enter the setpoint at which the output should be turned on.

Enter the PB Limit. This is the value for which the output’s on duration will be maximum.

7/99

9782 Series Conductivity/Resistivity Analyzer/Controller - Operator’s Manual

5-15

Page 71
Image 71
Honeywell 9782 Series Procedure for Configuring DAT Control, Action Go to Configuration Discrete Control DAT, Dat, DAT1