Power Wiring

4. Power Wiring

4.1 Overview

Introduction

This section contains instructions for installing ac power wiring for the Analyzer/Controller, in preparation for configuring the software and performing I/O setup as described in Section 5.

We recommend that you wait to install input and output wiring (see Section 6) until after I/O setup. During I/O setup the software will determine for you which relay to use for each feature.

What’s in this section?

The topics in this section are listed below.

Topic

4.1Overview

4.2General Wiring Practices for Power Wiring

4.3Power Wiring Considerations

4.4Installing Power Wiring

See Page

4-1

4-2

4-3

4-4

7/99

9782 Series Conductivity/Resistivity Analyzer/Controller - Operator’s Manual

4-1

Page 51
Image 51
Honeywell 9782 Series manual Power Wiring