Diagnostics and Messages
9.5 Off-Line Diagnostics
Introduction
The following
∙display test (see 9.5.1)
∙keyboard test (see 9.5.1)
∙output tests (see 9.5.2)
9.5.1Display and Keyboard Test
Procedure
The procedure for initiating the display and keyboard test is described in Table
Table 9-4 Procedure For Initiating Display and Keyboard Tests
Step
1
2
Screen
MENU
CONFIGURATION
CALIBRATION
MAINTENANCE
I/O SETUP
DIAGNOSTICS
PREV NEXT
MAINTENANCE
OFFLINE FUNCTIONS
INSTRUMENT SETUP LEAD RESISTANCE COMP
DIAGNOSTICS
PREV NEXT
DISPLAY TEST
KEYBOARD TEST OUTPUT/RELAY TEST OUTPUT CALIBRATON
DIAGNOSTICS
PREV NEXT
DISPLAY TEST
DIAGNOSTICS
DTEST
DISPLAY TEST
F1=TOGGLE MENU=ABORT
DIAGNOSTICS
Action
Go to MAINTENANCE OFF-LINE FUNCTIONS
DISPLAY TEST.
Pressing the specified function key will display a test pattern on the first line of the display. Press the key repeatedly to test the rest of the display.
After confirming that each line of the display is functional, press the MENU key to return to the
7/99 | 9782 Series Conductivity/Resistivity Analyzer/Controller - Operator’s Manual |