![](/images/new-backgrounds/1327881/32788121x1.webp)
Return to Section TOC
Return to Section TOC
Return to Section TOC
Return to Section TOC
Return to Master TOC
Return to Master TOC
Return to Master TOC
Return to Master TOC
INSTALLATION
PARALLEL OPERATION
The
To set machine outputs, start with output control pots and arc control pots in identical positions. Use the output control pots to balance the currents and main- tain the desired current. The arc control pots should be kept identical on the two machines.