Setting Up the System 2-5
! A location where corrosive gas (sodium chloride, sulfur dioxide,
hydrogen sulfide, nitrogen dioxide, or ozone) is generated, or a location
that is close to chemicals or exposed to chemicals.
! A location whose floor is covered with non-antistatic carpet.
! A location that may be subject to falling objects.
! A location where you may step or trip on the power cords or interface
cables.
! A location that is close to equipment that generates intense magnetic field
(e.g., TV set, radio, broadcasting/communications antenna, power
transmission wire, and electromagnetic crane). (If unavoidable, contact
your sales agent to request proper shield construction.)
! A location where the power cord of the server must be connected to an
AC outlet that shares the outlet of another device using large power
consumption.
! A location that is close to equipment that causes power noises (e.g.,
sparks caused by power-on/off using a relay). If you must install the
server close to such equipment, request your sales agent for separate
power cabling or noise filter installation.
!
WARNING
It takes at least four people to safely carry the server; hold it
firmly by its bottom and place it slowly at the selected site.
After positioning the server, lock its two front casters and screw the attached
four stabilizers onto the cabinet adjusting their height as required.
Lock Lever
Stabilizer
Screws
Figure 2-1. Tower Model Lock and Stabilizer Locations