!A location where corrosive gas (sodium chloride, sulfur dioxide, hydrogen sulfide, nitrogen dioxide, or ozone) is generated, or a location that is close to chemicals or exposed to chemicals.

!A location whose floor is covered with non-antistatic carpet.

!A location that may be subject to falling objects.

!A location where you may step or trip on the power cords or interface cables.

!A location that is close to equipment that generates intense magnetic field (e.g., TV set, radio, broadcasting/communications antenna, power transmission wire, and electromagnetic crane). (If unavoidable, contact your sales agent to request proper shield construction.)

!A location where the power cord of the server must be connected to an AC outlet that shares the outlet of another device using large power consumption.

!A location that is close to equipment that causes power noises (e.g., sparks caused by power-on/off using a relay). If you must install the server close to such equipment, request your sales agent for separate power cabling or noise filter installation.

!WARNING

It takes at least four people to safely carry the server; hold it firmly by its bottom and place it slowly at the selected site.

After positioning the server, lock its two front casters and screw the attached four stabilizers onto the cabinet adjusting their height as required.

Screws

Stabilizer

Lock Lever

Figure 2-1. Tower Model Lock and Stabilizer Locations

Setting Up the System 2-5

Page 52
Image 52
NEC 320Lb-R manual Screws Stabilizer Lock Lever