Precautions

The following warnings and cautions apply throughout this chapter. Only a technically qualified person should integrate and configure the system.

The only procedures that can safely be done with the system power on is removing or installing (hot-swapping) an SCA disk drive/carrier assembly in the SCSI hot-swap drive cage, or hot swapping a CPU or PCI module. Note that hot-swapping a PCI module or a CPU module requires that the other module be operating properly. For any other procedures inside the system, turn off system power and disconnect the AC power cord (s).

!WARNING

Before doing any procedures in this chapter that require the server to be off, make sure that your system is powered off and unplug all AC power cords. Failure to disconnect power before opening your system can result in personal injury and equipment damage.

System power on/off. The DC push-button on/off switches DO NOT turn off the system AC power. To remove power from system, you must unplug the AC power cords (from wall outlets or power supply).

Hazardous conditions, power supply. Hazardous voltage, current, and energy levels are present inside the module power supplies. There are no user serviceable parts inside these supplies; servicing should be done by technically qualified personnel.

Hazardous conditions, devices & cables. Hazardous electrical conditions may be present on power, telephone, and communication cables. Turn off the system and disconnect the power cords, telecommunications systems, networks, and modems attached to the system before opening it. Otherwise, personal injury or equipment damage can result.

CRU Replacement and Server Upgrades 4-3

Page 94
Image 94
NEC 320Lb-R manual Precautions