174CHAPTER 8: OPTIMIZING A NETWORK PLAN
2Select the scope for the work order.
You can select the network plan, a site, a building, or an individual floor.
3Select the language: English or German
4To change the output directory for the report, click on the button next to output directory, navigate to the new directory, and click Select.
5Click Generate.
6When the report is generated, click View.
A browser window containing the report opens.
7Click View Site Survey Order to view the site survey work order.