Configuration task list
Use either of the following approaches or the combination of them to configure a VLAN, as shown in 1 and
2:
1.VLAN configuration task list (approach I)
Task | Remarks | |
Creating VLANs | Required | |
Create one or multiple VLANs. | ||
| ||
|
| |
| Required | |
Selecting VLANs | Configure a subset of all existing VLANs. This step is required before | |
| displaying, modifying, or removing a VLAN. | |
|
| |
| Required | |
Modifying a VLAN | Configure the untagged member ports and tagged member ports of the VLAN, | |
| or remove the specified ports from the VLAN. | |
|
|
2.VLAN configuration task list (approach II)
Task | Remarks | |
Creating VLANs | Required | |
Create one or multiple VLANs. | ||
| ||
|
| |
| Required | |
Modifying ports | Configure ports as the untagged members or tagged members of VLANs, or | |
| remove ports from VLANs; configure the link type and PVID of the ports. | |
|
|
Creating VLANs
Select Network VLAN from the navigation tree and click the Create tab to enter the page shown in a.
138