Figure 4-15 HP ProLiant DL365 Server Rear View

The callouts in the figure enumerate the following:

1.This port is the Ethernet connection to the Console Switch. On the back of the node, this port is marked with the acronym iLO.

2.This port is the connection to the Administration Switch (branch or root). On the back of the node, this port is marked with the number 1.

3.If a Gigabit Ethernet (GigE) interconnect is configured, this port is used for the interconnect connection. Otherwise, it is used for an external connection. On the back of the node, this port is marked with the number 2.

Setup Procedure

Perform the following procedure from the iLO Setup Utility for each HP ProLiant DL365 node in the hardware configuration:

1.Use the instructions in the accompanying hardware documentation to connect a monitor, mouse, and keyboard to the node.

2.Turn on power to the node. Watch the screen carefully during the power-on self-test, and press the F8 key when prompted to access the Integrated Lights Out Setup Utility.

3.Make the following iLO settings for ProLiant DL365 nodes, as shown in Table 4-25:

Table 4-25 iLO Settings for HP ProLiant DL365 Nodes

Menu Name

Submenu Name

Option Name

Set to This Value

User

 

Add

Create a common iLO user name and password for every

 

 

 

node in the hardware configuration. The password must

 

 

 

have a minimum of 8 characters by default, but this value

 

 

 

is configurable.

 

 

 

The user Administrator is predefined by default, but

 

 

 

you must create your own user name and password. For

 

 

 

security purposes, HP recommends that you delete the

 

 

 

Administrator user.

 

 

 

You must use this user name and password to access the

 

 

 

console port.

 

 

 

 

Network

DNS/DHCP

DHCP Enable

On

 

 

 

 

4.Select FileExit to exit the Integrated Lights Out Setup Utility and resume the power-on self-test.

5.Watch the screen carefully, and press the F9 key when prompted to access the ROM-Based Setup Utility (RBSU).

Perform the following procedure from the RBSU for each HP ProLiant DL365 node in the hardware configuration:

4.7 Preparing the Hardware for CP4000 (AMD Opteron) Systems 95