Topcom X20 manual Installing the Spray ECU V1.98 21/06/06

Models: X20

1 172
Download 172 pages 56.91 Kb
Page 12
Image 12

Installing the Spray ECU

V1.98 21/06/06

 

 

6.Connect the Sprayer Switchbox, shown in Figure 3, to the '9-pin connector marked SWITCHBOX on the Spray ECU. Then mount the Sprayer Switchbox using the double- sided tape supplied or other suitable means. Mount the Sprayer Switchbox in a position which is easily accessible while spraying.

Note: The Sprayer Switchbox can be used so, one switch, switches one boom section ON and OFF. If the sprayer has more than six boom sections then the ZYNX Sprayer software can be setup so that one section switch, switches more than one boom section ON and OFF. The operator can custom map the boom sections.

See Section 17.10 for details of the functions of the Sprayer switchbox.

7.For reference or troubleshooting at the back of this manual Section 21.7 shows the pin out tables for each of the Spray ECU 30S Connector’s.

Page 12

Page 12
Image 12
Topcom X20 manual Installing the Spray ECU V1.98 21/06/06