
145
System rack installation
The Altos G900 server system is available in both
The figure below shows the Altos G900 server in a rack-mount and tower position.
Tower position |
Figure 56 - Server orientation
Important: When installing or removing the server from the rack, use an appropriate mechanical assist unit to lift and move the server.
Rack-mount kit contents
The rack conversion kit for the Altos G900 server platform contains the following items:
•Rack bezel and keys
•Rack handle kit (handles and screws)