154

Appendix A: System rack installation

3Attach the three bushings on the left frame wall of the chassis (Figure 63, E) in the pattern shown in Figure 65 using the same procedure described in step 1.

Figure 63- Installing the bushings

Installing the handles and rails

To complete the installation the rack conversion kit contents, you must also have the rack-mount rail kit.

WARNING! To avoid personal injury when handling the server, use a hand-truck or other mechanical assist unit to move the server from one location to another. Do not attempt to lift or move the server by the handles on the power supplies.

Refer to the installation guide that came with the rack-mount rail kit for detailed instructions on installing the handles and rails, as well as mounting the server in the rack.

Page 170
Image 170
Acer G901 manual Installing the handles and rails, Installing the bushings