43

Tools and supplies needed

You will need the following items in installing the system components:

Phillips screwdriver

Small flat-bladed screwdriver

Extraction tool for processor heat sink clips

Antistatic wrist strap and conductive foam pad (recommended)

Pen or pencil

Equipment log (for a sample sheet, refer to page 195)

As you integrate new components into the system, record the model and serial number of the server system, all installed options, and any other pertinent information specific to the server system. You will need this information when running the SSU.

Page 59
Image 59
Acer G901 manual Tools and supplies needed