30 | 2 System setup |
•Clearance provided for cooling and airflow.
Note: Surge suppressor recommended: In geographic regions that are susceptible to electrical storms, it is strongly recommended that you plug the server into a surge suppressor.
Checking the package contents
Remove the server from the packaging container and, using the list below, check that all parts and accessories are included. Inspect the server and accessories for damage. If any of the contents appear damaged, file a damage claim with the carrier immediately.
The Altos G900 system comes with the following parts installed:
•System components
•Altos G900 mainboard
•Altos G900 processor board
•Altos G900 memory board
•Fan distribution board
•Front panel board
•Hot plug indicator board
•Power distribution board
•Two
•Six fan modules
•
•
•
•Bezel and feet for tower
•Three sets (six rails)
•Two North American power cords
•System accessory box