30

2 System setup

Clearance provided for cooling and airflow.

Note: Surge suppressor recommended: In geographic regions that are susceptible to electrical storms, it is strongly recommended that you plug the server into a surge suppressor.

Checking the package contents

Remove the server from the packaging container and, using the list below, check that all parts and accessories are included. Inspect the server and accessories for damage. If any of the contents appear damaged, file a damage claim with the carrier immediately.

The Altos G900 system comes with the following parts installed:

System components

Altos G900 mainboard

Altos G900 processor board

Altos G900 memory board

Fan distribution board

Front panel board

Hot plug indicator board

Power distribution board

Two 600-W power supplies

Six fan modules

3.5-inch floppy drive

5.25-inch CD-ROM drive

1-inch hard disk drive bay

Bezel and feet for tower

Three sets (six rails) 5.25-inch peripheral rails and screws

Two North American power cords

System accessory box

Page 46
Image 46
Acer G901 manual Checking the package contents